Road Maintenance Activities - February 25, 2015
Below: Paving roadway to repair crack in roadway in line with crack in Wall 3. Paved in this location on 1/21, 2/13 and 2/26/15.
Below: South end of Wall 3.
Below: Crack in Wall 3 (same location fixed as part of emergency Last Chance Grade project. Concrete fell out.
Below: As a result of road movement, this drop inlet has disconnected with downdrain pipe. Runoff will not drain through pipe, but under pipe.
(First photo taken 2/13/2015, second taken 2/26/2015. See April 2, 2015 page to view repair)
Below: Soil fallen away from south end of new Wall 5
\
Below: Looking southbound, West side of 101, approximately 150 feet south of new Wall 5 and just north of Wall 3 (top, taken February 13, 2015; bottom, taken February 26, 2015).
Below: Looking south on February 26, 2015. Roadway was cracking.